Realign existing structures to the correct setback, resolve encroachments, and anchor on a new plinth with engineered lateral shifting.
A planned lateral movement relocates the structure to the new alignment or setback using synchronized jack-and-rail systems. Temporary steel staging, cribbing, and continuous level checks keep the frame stable while the structure slides to the designed position.
Get a free site assessment and a detailed, itemized estimate from our engineering team.